View Categories

Shutter Installation FAQs

< 1 min read

Shutter Installation FAQs

  • Are shutters hard to clean and maintain once installed?

    No. One of the practical benefits of shutters is that they are relatively low maintenance. In most homes, light dusting or a wipe with a damp cloth is enough to keep them looking smart. Find out more about The Oxford Shutter Company, including the warranty that comes with every installation for extra peace of mind.

  • What if a shutter is damaged after installation?

    If damage happens later, replacement parts can be ordered to match the original finish, colour and size as closely as possible. That makes repairs more straightforward than having to replace the entire installation unnecessarily.

  • Do I need to do anything before the fitter arrives?

    Usually, it helps to clear the immediate area around your window so the fitter has safe working space and easy access. Beyond that, most of the preparation is handled during the consultation stage, when measurements are taken and the design is agreed.

  • Can shutters be installed in bay windows or awkward spaces?

    In many cases, yes, because made-to-measure shutters can be designed around more challenging window shapes and layouts. Take a look at our bay window shutters range to see how the installation is planned around your room rather than forced into a standard format.

  • Will shutter installation make a mess in my home?

    Our process is designed to be tidy and efficient, not disruptive for the sake of it. We also vacuum the work area once fitting is complete, leaving the room clean and ready to use.

  • What happens on the day of shutter installation?

    You will be given a fitting date and a specific time in advance, so you know when to expect the installer. On the day, the shutters are fitted, adjusted and checked properly so they open, close and tilt as they should before the job is signed off.

  • Who installs the shutters, and are they experienced?

    Installation is carried out by an experienced fitter with a carpentry background, so the emphasis is on careful workmanship and a tidy finish. That extra practical experience is especially useful where window shapes, recesses or older properties need more attention to detail.

  • How long does shutter installation usually take from order to fitting?

    Because the shutters are bespoke, the usual lead time is around 10 to 14 weeks once the order is confirmed. If a quicker turnaround is needed, get in touch to ask about our air freight options , which can reduce the wait to around 4 to 6 weeks on some orders.

  • Are shutters measured to fit each window?

    Yes, shutters are made to measure rather than cut from a standard template. That matters for bay windows, sash windows, shaped openings and other features where accurate measuring is essential for a neat, long-lasting fit.

  • Do I need a home survey before shutter installation?

    Yes. The Oxford Shutter Company starts with a free home consultation so your windows or doors can be measured properly and the right panel, frame and finish can be discussed. That helps avoid guesswork and makes the installation process smoother from the outset.

Powered by BetterDocs